This listing is closed

Bliss Welded Products- 200 Ton Straight Sided Power Press - 25 mm Stroke (Mitsui Automatic Core Assyembly System )-( Mac Moi-110-01 with Stator Stack ,Auto Gauging - Mac Control Box - Electrical Sub Board 415 Volt 3 Phase with Sound Booth ( Overall Size Approx 3500 mm Wide x 2200 mm Deep x 4900 mm High ( Buyer to Arrange All Removal , Electrical and Dismantled to Be Done By Professional Licenced Trades People )

$15.00

9 Sheffield Street, Woodville North SA, Australia
Bidding is closed for this item.

Lot Information

Lot Description

Bliss Welded Products- 200 Ton Straight Sided Power Press - 25 mm Stroke (Mitsui Automatic Core Assyembly System )-( Mac Moi-110-01 with Stator Stack ,Auto Gauging - Mac Control Box - Electrical Sub Board 415 Volt 3 Phase with Sound Booth ( Overall Size Approx 3500 mm Wide x 2200 mm Deep x 4900 mm High ( Buyer to Arrange All Removal , Electrical and Dismantled to Be Done By Professional Licenced Trades People )

Bid History

Bid # Bidder Amount Quantity Allocated Date
1 58709 $15.00 1 1 Mon, 12 Aug 2019 at 4:53 PM
* = AutoBid, ^ = BuyItNow

Auction Description

Please Note the Following Auction Specific Terms - By registering for this auction you acknowledge these, and all other terms of sale as specified. 

Collection: By Appointment as arranged with Evans Clarke National post closure of auction

Payment: All assets must be paid for in full prior to any work commencing onsite.

Asset Removal: It is the purchasers responsibility to remove all purchased lots from site. This includes all asset preparation for transport.

Tradespeople and Contractors: All (e.g. electricians, plumbers, riggers, equipment operators) must produce relevant licences and/or white card prior to the commencement of any work on site.

Tooling, Plant & Equipment: Any equipment used onsite in the removal of purchased items must be tested & tagged, and/or compliant with OHW&S legislation and requirements,

Onsite Work: All work carried out onsite must be compliant with all OHW&S legislation, appropriate PPE must be utilised as required or specified.

Site Access: All site attendees must comply with directions given by the Vendor or Auction Staff

Environmental Compliance: All removal, disassembly of assets and work conducted onsite must be compliant with the Environmental Protection Act 1993

Important Information

Item Code 99055+1
Safety Advice WHS hazard assessment may be required before being placed into use.
Views This item has been viewed 264 times.